Skip to main content

Construction Loan Cost Calculator

Estimate what a ground-up build costs before you buy the lot. Enter the land, the build budget, soft costs and the value once it is finished, then your financing, to see the total project cost, the cash you bring, interest on the drawn balance and the profit if you sell. Every figure is yours; nothing here is a quote.

Updated November 19, 2026

Enter your build figures

Use US dollars. Blank optional figures count as zero.
The project

Soft costs are plans, engineering, permits and fees. Land you already own counts at what you paid or what it is worth.

Financing

Enter a rate and points you want to test. RPC does not publish loan rates. The build money is paid out in draws, so on average only part of the loan is out while you build. Leave the drawn share blank to count the whole loan.

Other costs

Holding costs are what you pay each month while you build and sell: taxes, builder's risk insurance, utilities. Leave selling costs blank if you keep it.

How is the cost of a build worked out?

Add the project, the financing and the time it takes, then compare it with the value once it is finished.

Total cost = land + build budget + soft costs + contingency + closing costs + loan points + interest + holding costs + selling costs

Contingency = build budget × contingency %. Interest = loan amount × annual rate ÷ 12 × (months to build × average drawn share + months to sell). Points = loan amount × points %. Cash you bring = total cost, without selling costs, minus the loan. Profit = value when finished − total cost.

Worked example

These are hypothetical figures for learning, not RPC rates or an offer of financing.

Suppose you buy a lot for $150,000, plan a $400,000 build with $30,000 of soft costs and a 5% contingency, and expect the home to be worth $800,000 when it is finished. A $480,000 loan at an example rate of 11% with 2 points, half drawn on average over a 10-month build and fully drawn for the 3 months it takes to sell, with $8,000 of closing costs, $600 a month to hold and 6% selling costs, gives this estimate.

Project cost
$600,000
Loan interest
$35,200
Total cost
$708,600
Cash you bring
$180,600
Profit: $800,000 − total cost
$91,400

Construction calculator questions

What goes in the build budget and soft costs?

The build budget is the hard cost of construction: site work, foundation, framing, systems and finishes, usually from your builder's line-item budget. Soft costs are the rest of the work to get there: plans, engineering, permits, impact fees and inspections. Lenders review both against the plans before closing.

Why is interest worked out on the drawn balance?

Construction loans pay out the build money in draws as the work is inspected, so you pay interest only on what has been drawn. The average drawn share lets you model that: if the loan is drawn evenly over the build, about half of it is out on average. Leave it blank to charge interest on the whole loan, the higher and safer estimate.

What is the cash I bring?

It is the money you put in before the home sells or refinances: the total cost, without selling costs, minus the loan. It includes the land equity, any part of the budget the loan does not cover, closing costs, points, interest and holding costs.

Is this a loan quote?

No. It is an estimate from your own figures. A ground-up construction loan is sized on the project cost and the value once it is finished, and the leverage, rate, points and draw schedule are confirmed for each deal through underwriting.